Tzmudot (attached-housing) compounds
Tzmudot compounds — delivering infrastructure ahead of housing
The Tzmudot (attached-housing) compounds are a central pillar in implementing the umbrella agreement in Ashkelon. These are urban compounds in which extensive initial infrastructure has been invested — in preparation for occupancy of thousands of new housing units, adapted to the pace of development, coordinated with developers and creating complete urban continuity.
The Economic Company carries out all the infrastructure works required in these compounds:
from transport infrastructure, lighting, drainage and public-open-space development, through landscaping, signage, traffic signs, electricity connections and regulation of public areas.
The compounds include extensive areas of the city, among them:
Wine City — over 10,000 housing units, including an urban park, two strategic bridges (BR-1 and BR-2), pavements, traffic islands, lighting and landscaping.
Agamim East — extensive development of public open space, roads and electricity connections in advanced occupancy areas, including coordination of power lines and conditions for marketing.
Ir Yamim — 716 housing units and 1,400 hotel units, development of streets, lookouts and distinctive public open space.
Herzog, Ibn Ezra, Mitnachelím — infrastructure completions for marketing, waste removal, accompanying developers and planning according to the pace of occupancy.
High-tech park — supporting infrastructure works including burying power lines, parking, lighting and more.
All projects are delivered while addressing engineering challenges, regulatory barriers and multi-disciplinary planning.
The vision: to create sustainable neighborhoods, well connected to urban infrastructure — already from the first stages of occupancy.
Agamim East compound
A growing compound where infrastructure adaptations are being carried out ahead of further marketing and construction of housing units and public buildings. The emphasis is on developing public open space and coordinating infrastructure with the electric and water companies and private developers.
Location: south-east Ashkelon, east of the Rabin axis
Status: some 2,000 housing units marketed; Stage B development in occupied areas
Wine City compound
The Economic Company is carrying out intensive development including transport infrastructure, public open space, connections between neighborhoods and construction of educational institutions.
The compound is expected to become one of the largest and most central neighborhoods in the city.
Location: east of the city
Status: over 10,000 housing units marketed; advanced development works in an urban park, bridges, lighting and public open space
Ir Yamim compound
The compound also includes some 1,400 hotel units with significant tourism potential. The company is working to complete infrastructure and to identify planning and marketing solutions to advance hospitality.
Location: south-west of the city, near the seashore
Status: all housing units marketed; development of streets, public open space and a lookout in progress
Mitnachelím compound
The Economic Company is currently completing end-of-line infrastructure, access paths and green spaces for the student population and new residents. The compound is a significant connection between the academic and urban realms.
Location: near the Ashkelon Academic College campus
Status: all units marketed; development of 300 dormitory rooms
Ibn Ezra compound
The Economic Company is leading comprehensive development of transport infrastructure, including upgrading HaTaasiya Street and Eli Cohen Street, accompanying developers on site and establishing parking. Later, burying a high-voltage line that crosses the neighborhood is planned as part of this.
Location: west of the city, near Eli Cohen Boulevard
Status: development of roads, establishing parking and preparing the land for marketing the remaining units
Herzog compound
The Economic Company is leading advanced infrastructure works in the neighborhood, including upgrading the internal transport system, developing the public realm, drainage, lighting, pavements and landscaping — as part of completing the neighborhood.
Location: north of the city, between Herzog Street and Kadesh Boulevard
Status: Stage B development advanced, including upgrading streets and drainage works